Search
Wish list
Region
Region (uk)
Products
Company
Focus on

175 MW Solarpark

500.000 Solar modules installed on an area of 265 hectare

175 MW Solarpark
 175 MW SOLARPARK
 „DON RODRIGO“, SOUTHERN SPAIN 

Application of cable entry systems
 HSI 150-DFK AND HSI 90-DF 

Project description

500.000 Solar modules installed on an area of 265 hectare

Transport with the low loader

Due to the lightweight design using metal sheet floors instead of concrete, the transformer stations can be transported by large trucks from Germany to Southern Spain 

Glass fibre reinforced flanges pre-assembled and blind-sealed

The glass fibre reinforced flanges for retrofit dowelling were already pre-installed by the manufacturer of the transformer housings and closed with a HSI 150-D blind cover. For installing the HSI flanges on the metal sheet floor metal screws were used (according to the material thickness of the floor. Screws were provided locally). 

Compact design of the flanges

Depending of the performance of the different stations and the required number of cables several flanges were required. Due to the compact design of the flanges up to 7 can be installed in a row at the station floor. The installation of the supplied system cover HSI D3/58 as well as the sealing of the cable is done on site. 
Verwendete Produkte

Polymer flange

for retrofit dowelling

HSI150 DFK
For retrofit dowelling via core drill holes or for screwing onto housings. Used for the gastight and …

Aluminium flange

for retrofit dowelling

HSI90 DF
For retrofit dowelling with core drills or for screwing onto housings. Used for the gastight and watertight …