IBERDROLA 275KV „WINDY HILL“ SUBSTATION
Stop water leaking into the main station

IBERDROLA 275KV
„WINDY HILL“ SUBSTATION
„WINDY HILL“ SUBSTATION
Project information
Stop water leaking into the main substation
Seal cables effectively to prevent the ingress of water at the point of cable entry.

Leaking mastic sealing solution

Leaking mastic sealing solution

Entry point with test installation of 2 seals

Test installation of 2 seals

Installation of HRD 188-1G-1/97

Installation of HRD 188-1G-1/97